Youth in service to our church
2007
Preparing the main building for painting and general cleanup April 2007
Our first job was to remove everything from the walls in the hallways of the main
building
Some things had been on the walls since the church was built
Brackets were mounted to brackets which were in turn either nailed or screwed in to the walls
As the walls were cleared we washed them down in preparation for painting.
We also cleaned the main entry doors
back to:
picture index
main page